ISS Daily Summary Report – 6/19/2019

Materials International Space Station Experiment-11 (MISSE-11): Robotics Ground Controllers swapped MISSE Mission Science Carrier-5 (MSC-5) and MISSE MSC-6 positions. The ground then  commanded theElectrodynamic Dust Shield (EDS) hardware located in MSC-6 to an active status and verified full door open/closing capability. MSC-5 which is a passive payload was only able to open its hinge doors …


Click here for original story, ISS Daily Summary Report – 6/19/2019


Source: ISS Report