SpX-18 Capture, Berthing and Ingress: The Dragon vehicle was successfully captured at 8:12 AM CT yesterday. The robotic ground controllers then maneuvered the SSRMS to inspect the Dragon Passive CBM sealing surface and installed/berthed Dragon on the Node 2 Nadir CBM at 11:23 AM CT. The crew also completed vestibule pressurization, leak check and vestibule …
Click here for original story, ISS Daily Summary Report – 7/28/2019
Source: ISS Report