ISS Daily Summary Report – 10/28/2019

EML:  In support of the currently on-going batch 2.4, the crew closed the Argon valve system, opened the Helium valve system and switched the camera mode to RECAL.  The EML (Electro-Magnetic Levitator) is a 360 kg multi-user facility designed for containerless materials processing in space. It supports research in the areas of meta-stable states and …


Click here for original story, ISS Daily Summary Report – 10/28/2019


Source: ISS Report