ISS Daily Summary Report – 12/05/2019

CBEF-L (Cell Biology Experiment Facility-L): The crew performed the Humidifier Setup for CBEF Incubator Unit and inserted the LTL distribution box into the SAIBO rack. The crew then performed a setup of the Saibo Rack to a nominal configuration including connecting the CBEF Video Cable to IPU and sealed the CBEF-SAIBO sealing with Aluminium tape.  …


Click here for original story, ISS Daily Summary Report – 12/05/2019


Source: ISS Report