ISS Daily Summary Report – 5/05/2020

Payloads Wireless (Local Area Network) LAN Setup: The crew made the appropriate Wireless Adapter connection changes to prepare for a wireless access point (WAP)/camera checkout currently planned for next week.  The checkout will be between a Laptop in the Japanese Experiment Module (JEM) and an external WAP which is grappled by the Japanese Experiment Module …


Click here for original story, ISS Daily Summary Report – 5/05/2020


Source: ISS Report