ISS Daily Summary Report – 6/08/2020

Payloads  High-Definition Television (HDTV) Camera Removal:  The crew removed the HDTV hardware from the JEM Airlock (JEMAL) slide table and stowed it.  This is a continuation of the ops needed to prepare for the installation of the external JAXA integrated Standard Imager for Microsatellites (iSIM) experiment later this week. iSIM is a high-resolution optical binocular …


Click here for original story, ISS Daily Summary Report – 6/08/2020


Source: ISS Report