ISS Daily Summary Report – 7/14/2020

Payloads JEM Water Recovery System (JWRS): The crew retrieved the JEM WRS and performed inspections of the left, top and rear inside of the unit as well as checking fitting and coupler connections. Photos were taken and downloaded to the ground for evaluation. The Demonstration of JEM Water Recovery System (JWRS) generates potable water from …


Click here for original story, ISS Daily Summary Report – 7/14/2020


Source: ISS Report