ISS Daily Summary Report – 1/25/2021

Payloads CBEF-L (Cell Biology Experiment Facility-L): The crew greased the Front bolts and then replaced the Control Equipment within the CBEF which was then connected to the Drawer Interface Panel and cables. CBEF-L is a Japan Aerospace Exploration Agency (JAXA) new subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility …


Click here for original story, ISS Daily Summary Report – 1/25/2021


Source: ISS Report