ISS Daily Summary Report – 3/26/2021

Payloads HRF-2 (Human Research Facility-2): The crew removed the failed BRP Rack Interface Controller (BRIC) from HRF Rack 2 and replaced with a new Rack Interface Controller (RIC). Human Research Facility-2 (HRF-2) provides an on-orbit laboratory that enables human life science researchers to study and evaluate the physiological, behavioral and chemical changes induced by spaceflight. …


Click here for original story, ISS Daily Summary Report – 3/26/2021


Source: ISS Report