ISS Daily Summary Report – 6/08/2021

Payloads: FIR/LMM (Fluids Integrated Rack/Light Microscopy Module): Following the completion of several weeks of observations of the ACE-T-2 science module, the crew performed the steps necessary to remove ACE-T-2 and install the ACE-T-11 science module. Advanced Colloids Experiment-Temperature Control and Gradient Sample-11 (ACE-T-11) involves the design and assembly of complex three-dimensional (3D) structures from colloids, …


Click here for original story, ISS Daily Summary Report – 6/08/2021


Source: ISS Report