ISS Daily Summary Report – 7/09/2021

Payloads Expedite the Processing of Experiments to Space Station (EXPRESS) Rack 4 (ER4) International Subrack Interface Standard (ISIS) Drawer Check: Following an Iceberg-1 noise reported by the crew in early July, the issue was determined to be caused by a loose ISIS drawer lid in the location just below the Iceberg-1 unit. The crew attempted …


Click here for original story, ISS Daily Summary Report – 7/09/2021


Source: ISS Report