ISS Daily Summary Report – 4/19/2023

Payloads: AstroPi: A 5mm Camera Lens was mounted and on the AstroPi Vis hardware and the AstroPi hardware was removed from the Columbus module and installed into the Window Observational Research Facility (WORF). The lens was re-adjusted for day pass operations. The hardware will support the AstroPi Challenge mission ‘Life in Space’. Two augmented Raspberry …


Click here for original story, ISS Daily Summary Report – 4/19/2023


Source: ISS Report