ISS Daily Summary Report – 5/17/2023

Payloads: Dose Distribution Inside the International Space Station – 3D (DOSIS-3D): The DOSIS-3D main box was moved to its original location at the European Physiology Module (EPM) rack in the Columbus module.  ISS crewmembers are continually exposed to varying levels of radiation, which can be harmful to their health. DOSIS-3D uses several active and passive …


Click here for original story, ISS Daily Summary Report – 5/17/2023


Source: ISS Report