The crew members spent much of their day offloading the Permanent Multipurpose Module and filling the H-II Transfer Vehicle with items no longer needed aboard the station. They also performed maintenance on the Oxygen Generation Assembly and the Carbon Dioxide Removal Assembly.
The shuttle crew sleep period began at 7:23 p.m. EST, with a wakeup call scheduled for 3:23 a.m. Sunday.