The second of two Ariane 5 mission campaigns currently underway at the Spaceport has reached a new milestone with the completion of its vehicles basic build-up in French Guiana.
During activity in the Spaceports Launcher Integration Building, this Ariane 5 was initially topped-off with the incorporation of its ESC-A cryogenic upper stage and the vehicle equipment bay which were installed as a single unit.