ISS Daily Summary Report – 5/04/2020

SlingShot:  To prepare for the Slingshot deployer installation, the crew reviewed the big picture words, then installed the slingshot heater and controller inside the Cygnus vehicle.  The team is still discussing a plan for the cables which could not be connected last week.  SEOPS’ SlingShot is a small satellite deployment system that fits inside the …


Click here for original story, ISS Daily Summary Report – 5/04/2020


Source: ISS Report