In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians are halfway complete with a three-day leak test on space shuttle Endeavour’s environmental control and life support system, as well as structural leak tests.
The shuttle’s move, also known as rollover, to the Vehicle Assembly Building is scheduled for Dec. 12. Once inside, the Endeavour will be hoisted and then lowered onto the waiting mobile launcher platform where the massive external fuel tank and solid rocket boosters stand ready.
Today, the six STS-130 astronauts are studying flight procedures at NASA’s Johnson Space Center in Houston.
Shuttle Endeavour, with its payload of the Tranquility node and the seven-windowed Cupola module, is targeted to launch Feb. 4, 2010.